Dudgeon

The Dudgeon wind farm due to open in 2017 and will consist of 67 Siemens turbines. The farm will produce 402 megawatts which will provide power to more than 410,000 UK homes. It is owned by Statoil, Statkraft and Masdar and will cost £1.5 billion. Statoil will operate the wind farm out of Great Yarmouth. The turbine foundations were laid at the same time as the building of the substations in 2016. The cable from the wind farm comes ashore at Weybourne and the total area of the wind farm is 55km2. The operations and maintenance will be carried out from the port at Great Yarmouth.


Number of Turbines: 402


Power Generated (in MW): 67