Do you think there is some data we are missing or do you have data you would like to present?
If so contact Nick Richards at: N.Richards@hull.ac.uk
In 2012 the Sherringham Shoal wind farm was completed and consists of 88 Siemens turbines that can produce 317 megawatts when at full capacity. The wind farm cost £1.1 billion and is owned by Statoil and Statkraft.
Number of Turbines: 88
Power Generated (in MW): 317
© 2023 - The Logistics Institute Data Observatory
v2.0.7334.22091