Do you think there is some data we are missing or do you have data you would like to present?
If so contact Nick Richards at: N.Richards@hull.ac.uk
Select a start and finish point from the map
The Humber region has good road links connecting it to the whole of the UK. The four major Humber Ports are linked via the M18, the Humber Bridge and A63.
The high standard of the road network around the Humber, allows for businesses all over the UK to utilise the link into Europe through the surrounding ports. With the high density of logistics assets such as warehouses in the M1 and the A1 corridor, the Humber has the road network to take advantage of these assets.
Due to the Humber's exceptional transport links to the UK heartland, further investments of approximately £1.5bn have been made to improve the road network across Yorkshire and the Humber, as this shows the economic potential for such a region.
The road improvement in the Humber and Yorkshire region which are currently underway, due to start before 2020 or recently completed are:
Castle Street (A63) is one of the major routes into and through Hull. It is the main route from the Hull Port to the UK road network. On one side there is the Hull Marina and on the other there is the start of the main shopping area.
The road handles about 47,000 vehicles a day and a high percentage of these are vehicles coming in and out of the Port and the major businesses to the east of the city such as Saltend Chemical Park. Also the amount of traffic using this route is likely to increase due to the opening of the Siemens Gamesa manufacturing site in the Port.
To help better manage the flow of traffic a road improvement scheme has been developed by Highways England. The scheme will see the main road put underground in order to eliminate most of the junctions which allows people and vehicles to cross over Castle Street.
The project will include lowering the main road into the ground, putting a number of bridges in to allow traffic and pedestrians to move between the north side of the A63 and the south side where the Marina and a number of other attractions like Humber Street are located. The latest start date for the project is 2020 but this hasn’t been confirmed by the government or Highways England and the project is scheduled to take between 3 and 5 years. Although the main work will not start until at least 2020, preparation work has been going on for a couple of years. This includes surveys of the area, inspections of buildings in close proximity and the removal of human remains from a Trinity burial ground which lies next to the A63 and the land is needed for construction of the new road.
The main aims of the project are to:
• Improve access to the Port of Hull
• Relieve traffic congestion in the heart of the City
• Improve the safety of people who use Castle Street, both drivers and pedestrians
• Improve connectivity between the main City centre and the area around the Marina
A12 southbound between A414 near Chelmsford (west) and B1002 | Southbound | Road Works |
Location : The A12 southbound between the junctions with the A414 Chelmsford West and the A1023 . Lane Closures : Lane two will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 05:00 from 13 June 2018 to 16 June 2018. Lanes Closed : There will be one of two lanes closed. |
M25 anti-clockwise between J11 and J10 | Anti-Clockwise | Road Works |
Location : The M25 anticlockwise between junctions J11 and J10 . Lane Closures : Lane one will be closed. Reason : Emergency barrier repairs are planned. Status : Pending. Schedule : From 23:00 on 15 June 2018 to 05:30 on 16 June 2018. Lanes Closed : There will be one of four lanes closed. |
M1 northbound between J32 and J33 | Northbound | Road Works |
Location : The M1 northbound between junctions J32 and J33 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 20:00 on 13 June 2018 to 06:00 on 14 June 2018. Lanes Closed : There will be one of four lanes closed. |
M11 J11 northbound access | Northbound | Road Works |
Location : The M11 northbound entry slip at junction J11 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 18 June 2018 to 05:00 on 19 June 2018. Lanes Closed : All lanes will be closed. |
M20 eastbound between J4 and J5 | Eastbound | Road Works |
Location : The M20 eastbound between junctions J4 and J5 . Lane Closures : Lane one will be closed. Reason : Emergency roadworks are planned. Status : Pending. Schedule : From 20:00 on 18 June 2018 to 06:00 on 19 June 2018. Lanes Closed : There will be one of three lanes closed. |
M1 northbound between J21 and J21A | Northbound | Road Works |
Location : The M1 northbound between junctions J21 and J22 . Reason : Roadworks are planned. Status : Pending. Schedule : From 20:00 on 15 June 2018 to 06:00 on 16 June 2018. |
M27 westbound within J12 before M275 exit | Westbound | Road Works |
Location : The M27 westbound at junction J12 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 July 2018 to 7 July 2018. Schedule : From 21:00 on 9 July 2018 to 06:00 on 10 July 2018. Lanes Closed : There will be two of three lanes closed. |
A3 southbound within the M25 junction | Southbound | Road Works |
Location : The A3 southbound at the junction with the M25 . Lane Closures : Lane one will be closed. Reason : Emergency litter clearance is planned. Status : Pending. Schedule : From 22:00 on 19 June 2018 to 05:00 on 20 June 2018. Lanes Closed : There will be one of two lanes closed. |
A14 J28 westbound access | Westbound | Road Works |
Location : The A14 westbound entry slip at junction J28 . Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 June 2018 to 17 June 2018. Lanes Closed : All lanes will be closed. |
A12 northbound between B1002 and A414 near Chelmsford (west) | Northbound | Road Works |
Location : The A12 northbound between the A1023 and the junction with the A414 Chelmsford West. Lane Closures : Lane two will be closed. Reason : Emergency barrier repairs are planned. Status : Pending. Schedule : From 20:30 on 13 June 2018 to 05:30 on 14 June 2018. Lanes Closed : There will be one of three lanes closed. |
M25 anti-clockwise within J20 | Anti-Clockwise | Road Works |
Location : The M25 anticlockwise at junction J20 . Lane Closures : Lanes 1, 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 22:00 on 14 June 2018 to 05:30 on 15 June 2018. Schedule : From 23:00 on 15 June 2018 to 06:00 on 16 June 2018. Schedule : Expect disruption everyday between 22:00 and 05:30 from 18 June 2018 to 22 June 2018. Schedule : From 23:00 on 22 June 2018 to 06:00 on 23 June 2018. Lanes Closed : All lanes will be closed. |
A19 southbound exit for A186/A191 | Southbound | Road Works |
Location : The A19 southbound exit slip to the A191 . Lane Closures : Lane one is closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 15:30 on 13 June 2018. Lanes Closed : There is one of two lanes closed. |
M4 eastbound between J10 and J8 | Eastbound | Road Works |
Location : The M4 eastbound between junctions J10 and J8 . Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 09:00 and 17:00 from 18 June 2018 to 20 June 2018. |
M20 eastbound between J10 and J11 | Eastbound | Road Works |
Location : The M20 eastbound between junctions J10 and J12 . Lane Closures : Lanes 2 and 3 will be closed. Reason : Emergency roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 June 2018 to 15 June 2018. Lanes Closed : There will be two of three lanes closed. |
M6 southbound within J4 before M42 J7A northbound access | Southbound | Road Works |
Location : The M6 southbound between junctions J4 and J2 . Reason : Roadworks scheme. Status : Currently Active. Period : from 20:04 on 12 March 2018 to 06:00 on 3 January 2020. |
M5 southbound within J9 | Southbound | Road Works |
Location : The M5 southbound between junctions J9 and J15 . Lane Closures : The hard shoulder is closed. Reason : Emergency roadworks. Status : Currently Active. Period : expect disruption until 16:00 on 13 June 2018. |
link road from M11 J6 northbound to M25 J27 anti-clockwise | Anti-Clockwise | Road Works |
Location : The M25 anticlockwise entry slip at junction J27 From M11 North. Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 22:00 on 19 June 2018 to 05:00 on 20 June 2018. Lanes Closed : All lanes will be closed. |
M4 westbound between J12 and J13 | Westbound | Road Works |
Location : The M4 westbound between junctions J12 and J13 . Lane Closures : Lanes 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 22:00 and 06:00 from 13 June 2018 to 15 June 2018. Schedule : From 22:00 on 18 June 2018 to 06:00 on 19 June 2018. Schedule : Expect disruption everyday between 22:00 and 06:00 from 20 June 2018 to 22 June 2018. Lanes Closed : There will be two of three lanes closed. |
M40 northbound between J3 and J4 | Northbound | Road Works |
Location : The M40 northbound between junctions J3 and J4 . Lane Closures : The hard shoulder is closed. Reason : Road repairs. Status : Currently Active. Period : expect disruption until 23:59 on 30 June 2018. |
A19 southbound between A179 and A689 | Southbound | Road Works |
Location : The A19 southbound between the junctions with the A179 and the A689 . Lane Closures : Lane two will be closed. Reason : Horticultural works are planned. Status : Pending. Schedule : From 20:00 on 14 June 2018 to 06:00 on 15 June 2018. Lanes Closed : There will be one of two lanes closed. |
© 2023 - The Logistics Institute Data Observatory
v2.0.7334.22091