Do you think there is some data we are missing or do you have data you would like to present?
If so contact Nick Richards at: N.Richards@hull.ac.uk
Select a start and finish point from the map
The Humber region has good road links connecting it to the whole of the UK. The four major Humber Ports are linked via the M18, the Humber Bridge and A63.
The high standard of the road network around the Humber, allows for businesses all over the UK to utilise the link into Europe through the surrounding ports. With the high density of logistics assets such as warehouses in the M1 and the A1 corridor, the Humber has the road network to take advantage of these assets.
Due to the Humber's exceptional transport links to the UK heartland, further investments of approximately £1.5bn have been made to improve the road network across Yorkshire and the Humber, as this shows the economic potential for such a region.
The road improvement in the Humber and Yorkshire region which are currently underway, due to start before 2020 or recently completed are:
Castle Street (A63) is one of the major routes into and through Hull. It is the main route from the Hull Port to the UK road network. On one side there is the Hull Marina and on the other there is the start of the main shopping area.
The road handles about 47,000 vehicles a day and a high percentage of these are vehicles coming in and out of the Port and the major businesses to the east of the city such as Saltend Chemical Park. Also the amount of traffic using this route is likely to increase due to the opening of the Siemens Gamesa manufacturing site in the Port.
To help better manage the flow of traffic a road improvement scheme has been developed by Highways England. The scheme will see the main road put underground in order to eliminate most of the junctions which allows people and vehicles to cross over Castle Street.
The project will include lowering the main road into the ground, putting a number of bridges in to allow traffic and pedestrians to move between the north side of the A63 and the south side where the Marina and a number of other attractions like Humber Street are located. The latest start date for the project is 2020 but this hasn’t been confirmed by the government or Highways England and the project is scheduled to take between 3 and 5 years. Although the main work will not start until at least 2020, preparation work has been going on for a couple of years. This includes surveys of the area, inspections of buildings in close proximity and the removal of human remains from a Trinity burial ground which lies next to the A63 and the land is needed for construction of the new road.
The main aims of the project are to:
• Improve access to the Port of Hull
• Relieve traffic congestion in the heart of the City
• Improve the safety of people who use Castle Street, both drivers and pedestrians
• Improve connectivity between the main City centre and the area around the Marina
M1 southbound between J9 and J8 | Southbound | Road Works |
Location : The M1 southbound between junctions J9 and J8 . Reason : Emergency roadworks are planned. Status : Pending. Schedule : From 13:30 on 13 June 2018 to 15:30 on 13 June 2018. Schedule : Expect disruption everyday between 09:30 and 15:30 from 14 June 2018 to 15 June 2018. |
M4 eastbound between J19 and J18 | Eastbound | Road Works |
Location : The M4 eastbound between junctions J19 and J18 . Lane Closures : Lane three will be closed. Reason : Emergency barrier repairs are planned. Status : Pending. Schedule : From 20:01 on 13 June 2018 to 05:00 on 14 June 2018. Lanes Closed : There will be one of three lanes closed. |
A38 eastbound between A384 and B3352 near Ashburton (south) | Eastbound | Road Works |
Location : The A38 eastbound between the A384 and the junction with the A382 . Lane Closures : Lane two will be closed. Reason : Emergency roadworks are planned. Status : Pending. Schedule : From 19:01 on 13 June 2018 to 04:00 on 14 June 2018. Schedule : Expect disruption everyday between 19:00 and 04:00 from 14 June 2018 to 16 June 2018. Schedule : Expect disruption everyday between 19:00 and 04:00 from 18 June 2018 to 23 June 2018. Lanes Closed : There will be one of two lanes closed. |
A1(M) southbound between J51 and J50 | Southbound | Road Works |
Location : The A1M southbound between junctions J51 and J50 . Lane Closures : Lanes 2 and 3 are closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 20:00 on 13 June 2018. Lanes Closed : There are two of four lanes closed. |
A21 southbound between A25 and A225 | Southbound | Road Works |
Location : The A21 southbound between the junctions with the A25 and the A225 . Lane Closures : Lane one will be closed. Reason : Emergency roadworks are planned. Status : Pending. Schedule : From 20:00 on 15 June 2018 to 05:00 on 16 June 2018. Lanes Closed : There will be one of two lanes closed. |
M621 eastbound between J5 and J6 | Eastbound | Road Works |
Location : The M621 eastbound between junctions J3 and J7 . Reason : Road repairs. Status : Currently Active. Period : from 12:29 on 1 June 2018 to 06:00 on 28 June 2018. |
A42 northbound between A453 and M1/A453 | Northbound | Road Works |
Location : The A42 northbound between the A453 and the junction with the M1 . Reason : Roadworks scheme. Status : Currently Active. Period : from 21:01 on 11 June 2018 to 06:00 on 30 June 2018. |
M3 J14 eastbound access | Eastbound | Road Works |
Location : The M3 eastbound at junction J14 . Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 09:00 and 17:00 from 18 June 2018 to 22 June 2018. |
A14 eastbound between J7 and J8 | Eastbound | Road Works |
Location : The A14 eastbound between junctions J7 Kettering North and J9 Kettering South. Lane Closures : Lanes 1 and 2 will be closed. Reason : Horticultural works are planned. Status : Pending. Schedule : From 20:00 on 15 June 2018 to 06:00 on 16 June 2018. Lanes Closed : There will be two of three lanes closed. |
M1 southbound between J15 and J14 | Southbound | Road Works |
Location : The M1 southbound between junctions J15 and J12 . Reason : Roadworks scheme is planned. Status : Pending. Schedule : From 05:00 on 2 July 2018 to 05:00 on 1 March 2022. |
A1(M) J51 southbound access | Southbound | Road Works |
Location : The A1M southbound between junctions J51 and J50 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 June 2018 to 23 June 2018. Lanes Closed : All lanes will be closed. |
A34 southbound access from A420 | Southbound | Road Works |
Location : The A34 southbound entry slip from the A420 . Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 June 2018 to 22 June 2018. Lanes Closed : All lanes will be closed. |
M23 northbound between J9 and J8 | Northbound | Road Works |
Location : The M23 northbound between junctions J9 and J8 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 15 June 2018 to 05:00 on 16 June 2018. Lanes Closed : There will be two of three lanes closed. |
M42 J3 northbound exit | Northbound | Road Works |
Location : The M42 northbound exit slip at junction J3 . Reason : Horticultural works are planned. Status : Pending. Schedule : From 21:30 on 15 August 2018 to 05:30 on 16 August 2018. Lanes Closed : All lanes will be closed. |
M3 eastbound between J3 and J2 | Eastbound | Road Works |
Location : The M3 eastbound between junctions J3 and J2 . Lane Closures : Lanes 1, 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 22:00 and 06:00 from 18 June 2018 to 20 June 2018. Lanes Closed : There will be three of four lanes closed. |
M20 eastbound between J5 and J6 | Eastbound | Road Works |
Location : The M20 eastbound between junctions J5 and J6 . Reason : Emergency barrier repairs are planned. Status : Pending. Schedule : From 21:00 on 13 June 2018 to 06:00 on 14 June 2018. |
M6 southbound between J13 and J12 | Southbound | Road Works |
Location : The M6 southbound between junctions J13 and J12 . Reason : Roadworks. Status : Currently Active. Period : expect disruption until 23:59 on 24 October 2018. |
A1(M) northbound between J51 and J52 | Northbound | Road Works |
Location : The A1M northbound between junctions J51 and J53 . Lane Closures : The hard shoulder is closed. Reason : Emergency barrier repairs. Status : Currently Active. Period : expect disruption until 06:00 on 16 June 2018. |
M602 eastbound between J1 and J2 | Eastbound | Road Works |
Location : The M602 eastbound between junctions J1 and J2 . Lane Closures : The hard shoulder is closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 16:00 on 13 June 2018. |
M42 southbound between J7A and J7 | Southbound | Road Works |
Location : The M42 southbound between junctions J7A and J7 . Lane Closures : The hard shoulder will be closed. Reason : Barrier repairs are planned. Status : Pending. Schedule : From 09:00 on 14 June 2018 to 17:30 on 14 June 2018. Lanes Closed : There will be one of four lanes closed. |
A14 eastbound between J6 and J7 | Eastbound | Road Works |
Location : The A14 eastbound between junctions J6 and J7 Kettering North. Lane Closures : Lanes 1 and 2 will be closed. Reason : Horticultural works are planned. Status : Pending. Schedule : From 20:00 on 15 June 2018 to 06:00 on 16 June 2018. Lanes Closed : All lanes will be closed. |
M25 clockwise between J23 and J24 | Clockwise | Road Works |
Location : The M25 clockwise between junctions J23 and J25 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Emergency barrier repairs are planned. Status : Pending. Schedule : From 22:00 on 13 June 2018 to 05:00 on 14 June 2018. Lanes Closed : There will be two of four lanes closed. |
A180 westbound access from A160 | Westbound | Road Works |
Location : The A180 westbound between the A160 and the junction with the A15 . Reason : Road marking works are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 June 2018 to 22 June 2018. Lanes Closed : All lanes will be closed. |
M67 eastbound between J1 and A57 | Eastbound | Road Works |
Location : The M67 eastbound between junctions J1 and J2 . Lane Closures : Lane two will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 05:00 from 14 June 2018 to 16 June 2018. Lanes Closed : There will be one of two lanes closed. |
M40 northbound between J10 and J11 | Northbound | Road Works |
Location : The M40 northbound between junctions J10 and J11 . Lane Closures : Lanes 2 and 3 will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : From 22:00 on 14 June 2018 to 06:00 on 15 June 2018. Lanes Closed : There will be two of three lanes closed. |
M40 northbound within J1A before M25 J16 anti-clockwise access | Northbound | Road Works |
Location : The M40 northbound at junction J1A . Lane Closures : The hard shoulder is closed. Reason : Emergency barrier repairs. Status : Currently Active. Period : expect disruption until 23:59 on 30 June 2018. |
link road from A14 J31 westbound to M11 southbound/A14 westbound | Westbound | Road Works |
Location : The A14 westbound at junction J31 M11 Junction. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 June 2018 to 24 June 2018. Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 June 2018 to 1 July 2018. Lanes Closed : All lanes will be closed. |
A30 eastbound between A388 near Launceston (east) and A386 | Eastbound | Road Works |
Location : The A30 eastbound between the junctions with the A388 Launceston East and the A386 . Lane Closures : Lane two is closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 17:00 on 13 June 2018. Lanes Closed : There is one of two lanes closed. |
A38 northbound between A516 near Derby (south) and A516 near Derby (north) | Northbound | Road Works |
Location : The A38 northbound between the junctions with the A50 and the A5111 . Lane Closures : Lane one will be closed. Reason : Horticultural works are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 05:00 from 18 June 2018 to 22 June 2018. Schedule : From 20:00 on 25 June 2018 to 05:00 on 26 June 2018. Schedule : Expect disruption everyday between 20:00 and 05:00 from 2 July 2018 to 7 July 2018. Schedule : From 20:00 on 16 July 2018 to 05:00 on 17 July 2018. Lanes Closed : There will be one of three lanes closed. |
M1 northbound within J34 | Northbound | Road Works |
Location : The M1 northbound at junction J34 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 June 2018 to 15 June 2018. Lanes Closed : There will be two of three lanes closed. |
© 2023 - The Logistics Institute Data Observatory
v2.0.7334.22091